Permit & Site Guide

Metal Building Permits in Rutherford County, TN

Planning a barndominium, steel garage, workshop, or agricultural building in Murfreesboro or anywhere in Rutherford County? Here's what to expect on permits, setbacks, wind and snow loads, and HOA rules — plus a free, permit-ready quote from AAIRE Co.

Permit Required

Yes — Required

Rutherford County Building Codes requires a permit for accessory structures; one-story detached storage buildings 120 sq ft or smaller with no concrete foundation are exempt, but anything 120 sq ft or larger or on a permanent foundation needs a permit. A plot plan is required and structures can't sit in easements.

Wind Zone

115 mph

Ultimate design wind speed — verify with engineer

Snow Load

10 psf

Ground snow load, minimum design

Typical Setbacks

Varies by zoning; accessory structures must meet the minimum setback from property lines and avoid drainage/utility easements.

HOA Risk

High

High — one of TN's fastest-growing counties with extensive HOA-governed subdivisions in Murfreesboro, Smyrna, and La Vergne.

Permit Contact

Rutherford County Building Codes

615-898-7734

Pro Tip for Rutherford County

Bring a plot plan showing the building relative to the septic system, existing structures, property lines, and easements — applications without one won't be accepted.

Get a permit-ready quote for Rutherford County

Every AAIRE Co. steel building is engineered to your county's 115 mphwind requirements, with stamped drawings included for permitting. Tell us about your project and we'll send a free quote and walk you through what Rutherford County needs.

This guide provides general information based on publicly available county sources. Requirements change and vary by parcel, zoning district, and building use. Always verify current requirements directly with Rutherford County before purchasing land or starting construction. AAIRE Co. serves customers nationwide and can help you navigate the process.